Before adding soil, it’s important to set your overflow height correctly and check for leaks. This is much easier to do before the bed is completely filled.

The VEG wicking bed system uses an adjustable external outlet pipe (riser) to control the maximum water level in the reservoir. The aim is to keep the water just below the top of the screenings, preventing the soil from becoming waterlogged.

Follow these steps:

  1. Fill and level the reservoir: Add water through the inlet pipe and use the water surface as a guide to level your screenings. The screenings should be evenly distributed, with no significant high or low spots.
  2. Set the overflow height: Drain any excess water until the screenings look wet but there are no puddles on the surface. Adjust the external riser so its overflow height matches this level, at or just below the top of the screenings. If necessary, shorten the riser using suitable pipe cutters or a fine-toothed hacksaw. Measure carefully before cutting.
  3. Check for leaks: Inspect the outlet fitting, plumbing connections and outside of the bed for escaping water. Once the overflow has stopped running, leave the reservoir overnight if possible and check for unexpected water loss or damp patches around the bed.

Once you’re happy that the outlet is working correctly and there are no leaks, install the geotextile separation layer and add your soil.

Tip: Setting the overflow correctly is important for maintaining the separation between the water reservoir and soil, helping prevent waterlogging and anaerobic conditions. Refer to your VEG installation instructions or contact us if you’re unsure about your setup.

FREE Wicking Bed Quick Start Guide.
Get your copy today!

Cover of the Wicking Beds 101 Quick Start Guide
Cover and sample pages from the Wicking Beds 101 guide
Send us your details and we'll send the guide straight to your inbox.
You'll also get our lush Very Edible Gardens newsletter. Not your cup of tea? A single click and you're out!